• Learn about the conditions that led to Frank Furness' most incredible masterworks, including the Pennsylvania Academy of the Fine Arts seen here, on Wednesday.
      Learn about the conditions that led to Frank Furness' most incredible masterworks, including the Pennsylvania Academy of the Fine Arts seen here, on Wednesday.

Schuylkill Banks Boardwalk preview

The new Schuylkill Banks Boardwalk isn’t fancy, but it’s the sort of urban gesture that changes your view of a city. It says Philly is a place serious about investing in non-car mobility, connecting people with the river running through the heart of town, and building recreation amenities that enrich our public realm too. We build things like the boardwalk because they make city living better.

The new boardwalk extends the ever-popular Schuylkill River Trail south 2,000 feet, like a an arm bent out into the river to carry the trail from Locust to the South Street Bridge, parallel to the river’s eastern shoreline. It’s a $17 million collaborative project between the city and the Schuylkill River Development Corporation, funded through federal and state grants.

After watching boardwalk construction for the last year and a half from the South Street Bridge, I got to walk the boardwalk this week. The boardwalk is weeks from completion. As workers focus on final touches, the experience of being so close to the river is already delightful. Light and a gentle breeze played on the water. Skyline views are familiar but somehow new. The tide was coming in.

Boardwalk By the Numbers:

  • Length: .41 miles
  • Width: 15 feet wide
  • Distance from shore: 50 feet
  • Number of overlooks: 4
  • Cost: about $17 million (combined federal TIGER and state funds)

The boardwalk’s design elements are sturdy and simple, meant to withstand flooding. It is primarily built of concrete and stainless steel, supported by piers drilled 20 feet down into bedrock. The railings are horizontal bands of stainless steel, a more open design than those used elsewhere on the trail in the hope that they will trap less flood debris. The concrete surface is scored with a “boardwalk” pattern – meant to look like planks and ensure that the surface isn’t slippery. 

Back on May 1 the boardwalk had its first flood, submerged thanks to extreme rains the day prior. When the water receded the boardwalk was fine – some of the contractors’ tools and temporary wooden railings were not.

Though utilitarian, the boardwalk is infrastructure as public space. There’s no room for the trail to continue on land, so the boardwalk is a means for the trail to keep growing southward toward Fort Mifflin. It’s a key piece of The Circuit, our regional trail network, built with biking, running, and walking in mind. But the boardwalk also promises to be a public promenade meant for more passive activities, from fishing to people watching. The trail widens for four wide overlooks which will have benches so people can sit and take in the scenery. Plus, imagine what fireworks will look like from here on the Fourth of July.

When the boardwalk opens in about a month, Philadelphians will be able to walk on water (almost). Because of the river’s tidal variation of five or six feet and the boardwalk’s location about 50 feet from the shoreline, high tide promises to make the boardwalk feel like it’s floating on the river. Like the river, the boardwalk meanders. It’s jagged course should ensure that the boardwalk isn’t a raceway for those on wheels. These shifts also help reveal city vignettes that unfold gradually, and keep the .41-mile trip interesting.

Being able to see Center City, University City, the South Street Bridge, and the river from the boardwalk is rewarding. Looking across the water to the Schuylkill Expressway is not. Yet the boardwalk offers a study in city tempo: On the western side of the river cars speed on the expressway as Amtrak and SEPTA trains zip past in bursts. On the near side, CSX trains lumber along the tracks and on the trail cyclists and runners jostle for space with slower moving pedestrians. And then there’s the river’s tidal flow, with occasional boats. Soon the boardwalk will add its hum this busy flow. 

    • Boardwalk begins - near Locust Street looking south.
      Boardwalk begins - near Locust Street looking south.
    • The Connector Bridge runs parallel to and overlooks the new boardwalk
      The Connector Bridge runs parallel to and overlooks the new boardwalk
    • Boardwalk textures: Scored concrete, stainless stell railings
      Boardwalk textures: Scored concrete, stainless stell railings
    • Looking south from the boardwalk
      Looking south from the boardwalk
    • Finishing touches are being put on the boardwalk from railings to joints
      Finishing touches are being put on the boardwalk from railings to joints
    • The South Street Bridge from the boardwalk
      The South Street Bridge from the boardwalk
    • Looking south along the boardwalk
      Looking south along the boardwalk
    • Looking north, downriver from the South Street Bridge
      Looking north, downriver from the South Street Bridge
    • Northbound on the boardwalk
      Northbound on the boardwalk
    • Boardwalk skyline
      Boardwalk skyline
    • Heading north on the boardwalk toward Locust Street
      Heading north on the boardwalk toward Locust Street
    • Boardwalk from the Connector bridge overlook
      Boardwalk from the Connector bridge overlook
  • Previous
  • Next

About the author

Ashley Hahn, Managing Editor

Ashley Hahn started Eyes on the Street for PlanPhilly in 2011 and became PlanPhilly's managing editor in September 2015. She has a special interest in preservation, neighborhoods, and all things public – from policy to art. She holds masters degrees in City and Regional Planning and Historic Preservation from PennDesign. Ashley has lived in 12 zip codes that she can think of, including neighborhoods in Los Angeles, Chicago, Boston, New York and Philadelphia. She is proud to call 19147 home. 

Contact Ashley via email or find her on twitter: @ashleyjhahn.


blog comments powered by Disqus

Article Information

Recent Comments on PlanPhilly

Powered by Disqus

Subscribe to our mailing list

* indicates required
Which weekly emails would you like to receive?